Skip to content
Request a Demo

Product · Inspect

Every inspection done on site. With proof.

No more checklists filled in the office, and no more points skipped. From the RFI to the final sign-off, every check is filled at the site on the phone, with a live geotagged photo, the name and the time, following your maker, checker and approver workflow.

A steel-frame building under construction at dusk, lit up, with a tower craneOn site. On record.
digiQC inspectIllustrative view

Pre-Pour Concrete Inspection

Formwork alignment verifiedSubmitted · Rajan M · 09:14 AM
Reinforcement cover blocks placedSubmitted · Rajan M · 09:18 AM
Bar bending schedule verifiedSubmitted · Rajan M · 09:22 AM
PMC Approval pendingNotified via WhatsApp
Live · Block B, Floor 4Today, 09:24 AM
Illustrative product view. Actual configuration varies by project.

The problem

A paper checklist is filled after the work.

On most sites, the inspection report is written in the site office at the end of the day. The person who fills the form is often not the person who did the check.

When a defect turns into a dispute or a claim, there is no record anyone can trust.

This is not a people problem. It is a system problem.

  1. 01

    Checklists ticked in the office at the end of the day, from memory

  2. 02

    Signed by whoever is free, not by the engineer who checked

  3. 03

    Generic formats that ignore your specifications and sequence

  4. 04

    No record you can trust when a dispute or claim comes

The answer

Quality records that cannot be backdated, lost or altered.

Your checklist, filled on site, sent for approval, in one place. Every record carries a named person, a live geotagged photo and the actual time, and any checkpoint can carry a voice note. Once submitted, it cannot be backdated, lost or altered. Leadership sees inspection trends by project, stage and contractor, so quality improves project after project.

How it works

Four things change on site.

On every inspection, from the first check to sign-off.

01 · RFI

Every inspection can start with an RFI.

Anyone on the project can raise a Request for Inspection on the phone when the work is ready. The approver accepts it, or sends it back with a comment on what is missing. The checklist opens only after the RFI is accepted.

Illustrative product workflow
  1. 1
    RFI raisedBlock B, Floor 4 · Slab reinforcement
  2. 2
    RFI acceptedApprover · 08:52 AM
  3. 3
    Checklist openedInspection team assigned
02 · Stages

A checklist for every stage of the work.

Checklists are set up to match how your project is built, so the engineer sees each check in the order the work happens. Within a checklist, every point comes in order, and a missed one stays highlighted until it is done.

Illustrative product workflow
  1. 1
    Shuttering checkCompleted · Approved
  2. 2
    Reinforcement checkIn progress
  3. 3
    Pre-pour approvalNext in sequence
03 · On site

The report is made where the work is done.

Site teams submit from the phone, where the work is. Every photo is taken live in the app and geotagged. Old photos cannot be uploaded. It works offline and keeps the actual time.

Illustrative product workflow
  1. 1
    Formwork alignedPass
  2. 2
    Cover blocks placedPass
  3. 3
    3 live photosGeo-tagged
  4. 4
    Submitted byRajan M.
04 · Approval

Maker, checker, approver. Every sign-off traced.

Approval levels are set per checklist, following your maker, checker and approver workflow. Each person is notified on the app or WhatsApp. A rejected check goes back for re-inspection. Once submitted, a record cannot be backdated, lost or altered.

Illustrative product workflow
  1. 1
    Filled by the makerRajan M · Site Engineer
  2. 2
    Verified by the checkerAmit K · QA/QC Engineer
  3. 3
    Signed off by the approverPriya S · PMC · 09:31 AM
  4. 4
    Record savedCannot be backdated or altered

More trust in the office. Zero paperwork on site.

Management

  • A live feed of inspections and pending approvals across projects
  • First Time Right tracked by location, activity and contractor
  • A time-stamped record of every check that cannot be backdated, lost or altered, ready for any audit or dispute

Site team

  • Quick to learn and quick to submit on the phone
  • No end-of-day report writing. The report is made during the check
  • Works without internet, unlike WhatsApp or heavy ERP apps, so remote sites never miss a record

For every level

digiQC Inspect works for every level of your organisation.

The same record. A different question at each level.

01

Owner

Director / MD

Their concern

If a defect becomes a dispute, I need proof that quality was managed at every stage.

digiQC delivers

A time-stamped record of every inspection that cannot be backdated, lost or altered, found in seconds.

02

Top management

COO / Project Head

Their concern

I run many projects and have no consistent view of quality across them.

digiQC delivers

First Time Right, inspection completion and contractor performance in one view.

03

Project leadership

Project Manager / RE

Their concern

I need to know what my site team did today without calling four people.

digiQC delivers

A live feed of inspections, pending approvals and NCR status.

04

Site

Site Engineer / Supervisor

Their concern

I have a building to finish. I do not have time for paperwork.

digiQC delivers

A simple phone app that works offline. The record is done before you leave the spot.

Better together

Inspect is stronger with Issue and Register.

Each product feeds the next, so the record builds itself.

InspectIssue

A failed check raises an issue, as configured

The issue is filled in with the inspection details and assigned to the responsible contractor with a due date, as configured. No manual entry, no delay.

InspectRegister

A pre-pour approval links to the pour register

Inspection sign-offs are linked to register entries, so the test and the approval belong to the same event.

InspectDashboard

Every inspection feeds the live quality view

Management sees quality across every project at any time, without asking for a report.

"digiQC has now created measurable operational baseline data for SJ Contracts, which was not practically feasible to capture through the earlier paper-based system."
SJ Contracts Pvt. Ltd. · Implementation report, 2024
First Time Right, measured at stage level
86.4%
Average inspection turnaround
3.3 days
Average NCR closure time
2 days

Questions site teams ask

What you need to know about digiQC Inspect.

Does digiQC handle RFIs?

Yes. Anyone on the project can raise an RFI on the phone. The approver accepts it or returns it with a comment, and the inspection checklist opens only after the RFI is accepted. Every step is recorded with the name and the time.

Can an engineer upload an old photo?

No. Every photo is taken live in the app and geotagged.

Can a record be changed after submission?

No. Once submitted, a record cannot be backdated, lost or altered.

Does it work without internet?

Yes. The inspection is recorded with its actual time and syncs when the network returns.

Can we use our own checklist formats?

Yes. You set the sections, items, photo rules and approval levels for each checklist.

How long does it take to go live?

Most teams are live on their first project in 9 days, with an introductory web meeting, self-paced training and a practice project before go-live.

Is it easier for site staff than our ERP?

Yes. ERP and construction management software are complex for site staff and need internet. digiQC is simple, rated 4.7 on Google Play, and works without internet at remote sites.

See it for yourself

See digiQC Inspect on your own project.

30 minutes on the live product, with checklists like the ones your sites use.

Request a Demo

Live on your first project in 9 days · digiQC. Your quality partner.