Skip to content
Request a Demo

Solutions · Infrastructure

You build it, then you maintain it for years. Every defect missed today is a maintenance cost tomorrow.

On BOT, HAM and other PPP concessions, from highways and bridges to metro lines and sewage treatment plants, you look after the asset long after it opens. A missed check during construction comes back as repairs, shutdowns and higher maintenance costs. digiQC records every check on every package as you build, with a geotagged photo, the time and the engineer’s name, so problems are fixed before they are covered, and you keep the full record of how the asset was built.

Concession
Built for the years you maintain it
QA programme
Your IRC:SP:112 QAP, followed on site
Offline
Long linear sites, actual time of every check kept

On a concession project

What you build now, you maintain for years.

On a concession, the asset is yours to run long after it opens. Every layer, joint and structure built today decides what you spend on repairs for the rest of the contract. Yet on most packages, the record of how it was built is still in files at the site office.

MoRTH’s Section 100 asks every contractor to build quality assurance into every stage of the work, with a QA programme as per IRC:SP:112, submitted to the Engineer within 28 days of signing the Contract Agreement. Submitting the plan is the easy part. Following it on every layer, every day, with records to show for it, is the hard part.

digiQC keeps every test, inspection and NCR on one record, so problems are fixed before they are covered, the independent engineer sees what was checked, and you see where quality slips across packages.

  • Highways and expressways
  • Bridges and structures
  • Metro and rail
  • Water and sewerage

MoRTH Section 100 and IRC:SP:112

What the QA programme asks for, and the record digiQC keeps

digiQC does not replace your QA programme or the Engineer’s approval. It keeps the records your programme calls for, on one record the Engineer can review.

What the QA programme asks for

Quality assurance in every stage: setting out, materials, methods, equipment, staff and quality control testing

The record digiQC keeps

Your QAP and ITP set up as checklists and approval levels, stage by stage, so every check is done and approved on site

What the QA programme asks for

Critical quality attributes for long-term performance: compaction, joint quality, moisture control

The record digiQC keeps

Layer-wise checks with compaction, moisture and joint results, each with a live photo, the location, the time and a name

What the QA programme asks for

Method statement for each item of work, at least 28 days before it starts

The record digiQC keeps

The approved method statement and drawings attached to the checklist the site team uses

What the QA programme asks for

Materials inspected, tested and accepted before incorporation, as per IRC, BIS, AASHTO, ASTM or BS

The record digiQC keeps

Material inspections and test results in the Register, linked to the work they were used in

What the QA programme asks for

Inspection of materials and finished products at the source of supply

The record digiQC keeps

Source and plant inspections recorded the same way, with the Engineer’s approval on record

What the QA programme asks for

Works not conforming to specifications removed and replaced, with the defects corrected and approved

The record digiQC keeps

An NCR raised from the failed check, assigned with a due date and closed only after re-inspection with photo proof

What the QA programme asks for

Records of non-conformity and timely corrective actions

The record digiQC keeps

Every NCR, open and closed, by package and contractor, with how long it took to close

What the QA programme asks for

Document and data control, internal quality audit and calibration records

The record digiQC keeps

Inspections and NCRs that cannot be backdated, lost or altered, audits run as checklists, and calibration records in the Register with an audit trail

The problem

Where infrastructure quality records break

  1. Defects in maintenance

    A missed compaction, curing, joint or bearing check shows up years later as repairs.

    Consequence

    Your maintenance budget pays for it.

  2. Test results

    Test results sit in registers and files at the site office.

    Consequence

    Records are hard to produce when the engineer asks.

  3. NCR delays

    NCRs pass between contractor, engineer and project director for weeks.

    Consequence

    Defects stay open and get covered by the next layer.

  4. People change

    Quality engineers change, and the records go with them.

    Consequence

    Gaps in the record that nobody can fill.

  5. Audit night

    The night before an audit is spent finding papers.

    Consequence

    Audits judged on what can be found, not what was done.

How digiQC helps

Proof across every package

Every record has a named person, a live geotagged photo and the actual time. Inspections and NCRs cannot be backdated, lost or altered once submitted; register entries keep a full audit trail.

What is recorded, by type of work

5 levels
  1. Highways

    Setting out, earthwork, layer checks, compaction and moisture, bituminous work

  2. Bridges and structures

    Foundations, reinforcement, pour cards, bearings

  3. Metro and rail

    Structure, track and station works, by package

  4. Water and sewerage

    Pipe laying, joints, pressure tests, structures

  5. NCRs and audits

    Every NCR raised, assigned and closed with photo proof

Free infrastructure QC checklists

4 templates
  • Highway Infrastructure

    Layer-by-layer road construction checks.

  • Bridge Infrastructure

    Foundation to deck checks for bridges.

  • RCC Pour Card

    Before, during and after every pour.

  • Safety and Housekeeping

    Daily site safety checks.

Who it helps

What each person on the project gets

Concessionaire: MD and Projects Head

Owner

Every package built to last the concession, with one view of quality across every package and project. Fewer defects to repair in the years you maintain it.

Uses in digiQC
  • Inspect
  • Register

QA/QC Head

Quality standard

Your QAP and your formats, verified on site, with every test on record.

Uses in digiQC
  • Inspect
  • Register

Independent engineer

Review

See each contractor’s quality across packages, without waiting for the monthly report.

Uses in digiQC
  • Inspect
  • Issue

EPC contractor building for you

Execution

Every check by a named engineer, so the work handed to you is right before it is covered.

Uses in digiQC
  • Inspect
  • Issue
  • Register

Success story

How BuildStreet put a cross-country highway project on one quality record

Quality check approved on a construction site
Highway · Multi-package deploymentRepresentative photograph
“You cannot doubt that this inspection has been actually done, and rightly done, and done by the right person.”
Read the story

digiQC products

Three products, one quality record

Inspect and Issue records cannot be backdated, lost or altered once submitted. Register entries stay editable, with a full audit trail. Everything feeds one dashboard with analysis by project, stage and contractor.

01

Inspect

Layer checks, pour cards and structure inspections on site, with live photo, location and time.

Explore Inspect
02

Issue

NCRs raised, assigned to the contractor and closed only with photo proof, visible to the engineer.

Explore Issue
03

Register

Test results and quality records by package, ready for the engineer and the auditor.

Explore Register

FAQ

Questions infrastructure teams ask

Can the independent engineer see our records?

Yes. You can give the engineer access to the project to review and approve.

Can we use the QAP format from our contract?

Yes. Checklists and approval levels follow your QAP.

Does digiQC help with MoRTH Section 100 and IRC:SP:112?

It keeps the records your QA programme calls for: stage-wise inspections, material tests before incorporation, NCRs and corrective actions, internal audits and calibration records. The QA programme and the Engineer’s approval stay with you and the Engineer.

Does it work on long linear sites with no network?

Yes. Checks work offline and keep the actual time of inspection.

Why not use our ERP, construction management software or WhatsApp?

ERP and construction management software are complex for site staff, and need internet, which remote sites often do not have. WhatsApp needs internet too. digiQC is simple, rated 4.7 on Google Play, and works without internet.

How is digiQC priced?

digiQC works on subscription plans based on the number of users and projects in your company. Setup, training and support are included in the subscription.

Request a Demo

Be ready for the audit from day one.

A short walkthrough of digiQC set up for a highway, bridge, metro or water package like yours.

Request a DemoSee success stories

digiQC. Your quality partner.