Less rework, protected margins
Every stage of the work has its checklist on the phone, and a missed point stays highlighted until it is done.
For real estate developers
You manage your own construction, so rework comes out of your margin and every defect carries your brand. digiQC records every check on your sites with a live geotagged photo, the time and the engineer’s name, holds every contractor to their checks, and keeps the record for as long as you need it for any compliance check or audit.

The reality
Developers who run their own construction do it to protect two things: margin and quality.
Your own engineers, many contractors and several projects at once. The checks happen every day, but on paper or WhatsApp, and many are filled in the site office at the end of the day.
You see the result in the monthly review, or when a buyer finds a defect after possession. By then the rework has already cost margin, and the question is who checked it.
digiQC puts every project, contractor and check on one record, with every check under your control, from the first footing to the last snag at handover.
What goes wrong
Each one costs margin before it costs reputation.
A defect found after the next stage is built costs many times more to fix, in money and in time.
The checklist says OK, but the site tells a different story. You cannot tell whether the check was done on site.
Snags and NCRs stay open between your team and the contractor, and nobody can show how long.
Under RERA, the promoter must fix structural and workmanship defects reported within five years of possession. The paper files are long gone by then.
What changes
Less rework, protected margins
Every stage of the work has its checklist on the phone, and a missed point stays highlighted until it is done.
Accountability on every site
Every check carries a live, geotagged photo taken at the spot, the actual time and the name of the person who did it.
Contractors held to their checks
Snags and NCRs assigned to the contractor with a due date, closed only with photo proof, with how long each stayed open on record.
Handover snags closed before the keys
Your customer handover snags raised and closed flat by flat, on the same record as the construction checks.
Records for the years after possession
Inspections and NCRs that cannot be backdated, lost or altered, found by location in seconds, years later.
Every project in one view
Leadership sees quality across all projects and contractors, and approves remotely, without calling each project manager.
digiQC products
Three products, one connected record. Inspections and issues cannot be backdated, lost or altered once submitted; register entries keep a full audit trail.
Checklists from footing to finishing, completed at the point of work by your engineers or contractors, with a live photo and a recorded approval.
Explore InspectConstruction and handover snags assigned to the right contractor with a due date, and closed only with photo proof of the fix.
Explore IssueMaterial tests, pour records and approvals by tower and floor, linked to the inspections they support.
Explore RegisterRunning on developer projects today
Raymond Realty, Shivalik Group, Sangini Group, Shilp Group, Saheel Properties, B Safal, D&C Developers, Gruham Developers and Kavisha Group run quality on their own projects with digiQC.
What your peers say about digiQC
"Supervision has become transparent." (translated from Hindi)
"Our all projects quality parameters run on our app, so our all engineers, our all technical staff use that software."
"Even if I cannot go to the other project, I can still keep control." (translated from Hindi)
Across your company
Nobody prepares a separate version for anybody else.
Promoter, MD, Director Projects
Is quality across our projects under control, and is it protecting our margin?
One view of every project and contractor, with trends that show where quality slips.
Head of QA/QC
Is our standard followed on every project and by every contractor?
The company quality policy and each project’s checklists, followed with proof on every check.
Project Head, Project Manager
Which tower and which contractor need me this week?
Open snags, overdue checks and pending approvals, by project and contractor.
Handover, CRM
Which flats still have open snags before handover?
Handover snags raised, assigned and closed with photo proof, flat by flat.
Site Engineer, Contractor
What must be checked before this stage can go ahead?
The checklist for the work in front of them, on the phone, even without network.
Frequently asked
Yes. Each contractor works on the same project record and sees only its own work.
Yes. Handover snags are raised, assigned and closed on the same record as the construction checks.
They stay on record, searchable by location, for as long as your liability lasts.
Inspections and issues cannot be backdated, lost or altered once submitted. Register entries can be edited, and every change is kept in an audit trail.
ERP and construction management software are complex for site staff, and need internet, which remote sites often do not have. WhatsApp needs internet too. digiQC is simple, rated 4.7 on Google Play, and works without internet.
digiQC works on subscription plans based on the number of users and projects in your company. Setup, training and support are included in the subscription.
Next step
A short walkthrough of digiQC set up for a developer who builds its own projects.
digiQC. Your quality partner.