Gruham Developers
How Gruham Developers implemented digiQC to bring RERA-ready quality documentation to their residential projects
The client
Gruham Developers · India
Client profile
- Organisation
- Gruham Developers
- Role
- Owner / Developer
- Project type
- Real estate
- Region
- India
At a glance
Paper inspection forms since go-live
From sign-up to first live inspection
The challenge
How Gruham Developers implemented digiQC to bring RERA-ready quality documentation to their residential projects
Under RERA, defect liability means a claim can arrive long after handover. What decides the outcome is whether there is an authenticated record of what was checked, by whom, and when.
On residential work, the sequence of trades covers up the work of the one before. Once plaster is on, the only evidence of what was behind it is what was recorded at the time.
The objective was documentation that would be audit-ready from the first day rather than assembled when a claim arrived.
The outcome
What changed
Audit-ready quality records from day one
Records structured to answer a defect liability question from the start of the project.
Paper inspection forms since go-live
Inspection recording moved entirely to the point of work.
From sign-up to first live inspection
Time from starting to the first inspection recorded on site.
How it was done
The location hierarchy was configured down to the unit and the room, so an inspection or a non-conformance attaches to a precise place rather than to a floor.
Checklists followed the construction sequence — structure, MEP first fix, finishes and handover — so each stage was checked against what actually applied to it.
Every record is time-stamped and attributed, which is the form a defect liability claim requires years later.
Related stories
Other organisations that made the same shift.

- PMC
- Real Estate
HCP Project Management · Ahmedabad
How HCP moved quality from paper to live proof across its portfolio
- Quality view across all projects
- Live
- Paper inspection reports since go-live
- 0
- From sign-up to go-live
- 6d
- Contractor
- Real Estate
SJ Contracts Pvt. Ltd. · India
How SJ Contracts measured its quality for the first time
- First time right at stage level
- 86.4%
- Average EQC turnaround
- 3.3d
- Average issue closure time
- 2d

- Contractor
- Infrastructure
Buildstreet · India
How Buildstreet proved quality across every package of a highway project
- Packages set up at the same time
- All
- Paper inspection reports since go-live
- 0
- NCR tracking across the corridor
- Live
Next step
See digiQC on a project like Gruham Developers's.
A 30-minute demonstration configured around your project type and your role.
Live on your first project in 9 days · Unlimited users · Project-based pricing