Paper inspection reports
No paper inspection forms have been filed since go-live — every record is digital, authenticated, and time-stamped
PMC Real Estate Deployed 2023 · Ahmedabad, India
HCP Project Management, one of Ahmedabad's most respected PMCs, replaced fragmented paper-based quality records with real-time inspection governance on digiQC — going from sign-up to first live inspection within 9 days.
At a glance
No paper inspection forms have been filed since go-live — every record is digital, authenticated, and time-stamped
HCP management can see quality performance across all active projects without requesting updates from site teams
Kickoff, configuration, training, and first live inspection — completed within one week of signing up
Every non-conformance raised, assigned, and tracked to closure with photo evidence — no verbal instruction without a record
The Challenge
HCP Project Management has built a strong reputation in Ahmedabad's real estate sector by delivering projects that meet the standards their clients expect. But as their portfolio grew — more simultaneous projects, more contractor teams, more client relationships to manage — the limitations of their paper-based quality system became impossible to ignore.
Inspections were conducted on site by QA/QC engineers and recorded on paper checklists. Those checklists were filed in project folders at the site office. By the time they reached the project manager, they were often several days old. When a client asked about the quality status of a specific activity, the answer required a phone call to the site team, a search through the folder, and a summary that was already out of date before it was delivered.
Non-conformances were raised verbally or by WhatsApp message. There was no system tracking whether the contractor had actually addressed the issue — or when. When a defect resurfaced, there was no reliable record of who had been told, what action had been agreed, or whether a previous instruction had been followed.
HCP needed a quality governance system that could scale with their portfolio without requiring more people. They needed something that their site engineers would actually use on site — not fill in retrospectively at the office. And they needed the data to be reliable enough that they could show a client their quality performance with confidence, not with caveats about the accuracy of the records.
The Deployment
e.g. Residency Heights · South Bopal
e.g. Block A · Tower 1 · Wing East
e.g. Ground Floor · 3rd Floor · Terrace
e.g. Formwork · Pre-Pour · Column Casting
Project structure agreed
Checklists built
Mobile app onboarding
Quality KPIs visible
The Outcome
Every inspection conducted on site is submitted digitally at the point of work — time-stamped, user-authenticated, with photograph evidence attached. No retrospective write-ups.
Replaced: paper checklists filed at site officeHCP's management team can see inspection status, open NCRs, and contractor activity across all active projects from their dashboard — without a phone call, email, or site visit.
Replaced: phone calls and weekly summary emailsThe entire deployment — configuration, training, and go-live — was completed within 9 days. Site engineers were submitting authenticated inspections from their mobile phones by day six.
Expected by HCP: 3 to 4 weeksRelated stories
SJ Contracts Pvt. Ltd. · India

Buildstreet · India

Hero Future Energies · India
Recognise any of this?
30 minutes. Live platform. Configured for your project type and stakeholder role. No slides. No generic walkthrough.
Live on your first project in 9 days · 250+ organisations · 350+ active projects