PMC Real Estate Deployed 2023 · Ahmedabad, India

How HCP Project Management moved from paper to real-time quality governance — across their entire project portfolio.

HCP Project Management, one of Ahmedabad's most respected PMCs, replaced fragmented paper-based quality records with real-time inspection governance on digiQC — going from sign-up to first live inspection within 9 days.

6d
From sign-up to first live inspection
0
Paper inspection reports filed since go-live
Real-time
Quality visibility across all active projects
Multi-project
Portfolio deployment from day one

At a glance

About HCP Project Management

Organisation
HCP Project Management
Type
Project Management Consultant (PMC)
Geography
Ahmedabad, Gujarat · India
Project type
Real Estate — Residential & Commercial
Projects on platform
Multiple simultaneous projects
Products deployed
Inspect Issue
Time to go-live
6 days
Deployed
2023

Verified outcomes after deployment

0

Paper inspection reports

No paper inspection forms have been filed since go-live — every record is digital, authenticated, and time-stamped

Real-time

Portfolio quality visibility

HCP management can see quality performance across all active projects without requesting updates from site teams

6d

From sign-up to first live inspection

Kickoff, configuration, training, and first live inspection — completed within one week of signing up

Live

NCR tracking across all projects

Every non-conformance raised, assigned, and tracked to closure with photo evidence — no verbal instruction without a record

The Challenge

Managing quality across multiple projects — without any system that could be trusted when accountability was demanded.

HCP Project Management has built a strong reputation in Ahmedabad's real estate sector by delivering projects that meet the standards their clients expect. But as their portfolio grew — more simultaneous projects, more contractor teams, more client relationships to manage — the limitations of their paper-based quality system became impossible to ignore.

Inspections were conducted on site by QA/QC engineers and recorded on paper checklists. Those checklists were filed in project folders at the site office. By the time they reached the project manager, they were often several days old. When a client asked about the quality status of a specific activity, the answer required a phone call to the site team, a search through the folder, and a summary that was already out of date before it was delivered.

Non-conformances were raised verbally or by WhatsApp message. There was no system tracking whether the contractor had actually addressed the issue — or when. When a defect resurfaced, there was no reliable record of who had been told, what action had been agreed, or whether a previous instruction had been followed.

HCP needed a quality governance system that could scale with their portfolio without requiring more people. They needed something that their site engineers would actually use on site — not fill in retrospectively at the office. And they needed the data to be reliable enough that they could show a client their quality performance with confidence, not with caveats about the accuracy of the records.

The Deployment

From sign-up to first live inspection — within 9 days.

Location Hierarchy — HCP Real Estate Projects

4 levels
  1. Project

    e.g. Residency Heights · South Bopal

  2. Block / Wing

    e.g. Block A · Tower 1 · Wing East

  3. Floor

    e.g. Ground Floor · 3rd Floor · Terrace

  4. Activity

    e.g. Formwork · Pre-Pour · Column Casting

Checklists configured for HCP projects

6 templates
  • Structural inspection sequence — formwork, reinforcement, pre-pour sign-off, concrete placement, curing

  • Masonry and blockwork inspection — setting out, mortar consistency, plumb and level checks

  • Plastering and finishing — substrate preparation, thickness, surface flatness, curing

  • Waterproofing inspection — substrate, application, testing before screed or backfill

  • MEP rough-in inspection — before concealment in walls, slabs, or false ceilings

  • NCR and issue templates — pre-configured per activity type for rapid raising from site

Go-live timeline — six days from sign-up

  1. Day 1

    Kickoff call

    Project structure agreed

  2. Days 2–3

    Hierarchy configured

    Checklists built

  3. Days 4–5

    Site team training

    Mobile app onboarding

  4. Day 6

    First live inspection submitted from site

  5. Day 20+

    Dashboard live

    Quality KPIs visible

The Outcome

What changed — in numbers.

0

Paper inspection reports since go-live

Every inspection conducted on site is submitted digitally at the point of work — time-stamped, user-authenticated, with photograph evidence attached. No retrospective write-ups.

Replaced: paper checklists filed at site office
Real-time

Quality visibility for HCP management

HCP's management team can see inspection status, open NCRs, and contractor activity across all active projects from their dashboard — without a phone call, email, or site visit.

Replaced: phone calls and weekly summary emails
6d

From sign-up to first live inspection

The entire deployment — configuration, training, and go-live — was completed within 9 days. Site engineers were submitting authenticated inspections from their mobile phones by day six.

Expected by HCP: 3 to 4 weeks

What the outcome means for HCP's clients

Related stories

Other organisations that made the same shift.

  • Contractor
  • Real Estate

SJ Contracts Pvt. Ltd. · India

How SJ Contracts measured its quality for the first time

First time right at stage level
86.4%
Average EQC turnaround
3.3d
Average issue closure time
2d
Read the full story
  • Contractor
  • Infrastructure

Buildstreet · India

How Buildstreet proved quality across every package of a highway project

Packages set up at the same time
All
Paper inspection reports since go-live
0
NCR tracking across the corridor
Live
Read the full story
  • Owner
  • Renewable Energy

Hero Future Energies · India

How Hero Future Energies proves field quality on remote solar sites

Fully offline on a remote site
Remote
Inspection data verified at source
100%
Paper records since go-live
0
Read the full story

Recognise any of this?

Let us show you digiQC on your projects.

30 minutes. Live platform. Configured for your project type and stakeholder role. No slides. No generic walkthrough.

Request a DemoSee more success stories

Live on your first project in 9 days · 250+ organisations · 350+ active projects