At a glance
Average EQC turnaround
Average issue closure time
The challenge
How SJ Contracts created measurable quality baselines that were never possible with paper
As the contractor, SJ Contracts was responsible for the quality of the work it delivered on every project.
The difficulty with paper-based quality management is not that the checking fails. It is that the checking produces nothing measurable. Without a baseline, there is no way to say whether quality is improving, which stages fail most often, or how long a raised issue actually takes to close.
Establishing a measurable baseline was the objective, not digitising the existing forms.
The outcome
What changed
First Time Right — Stage level
The proportion of stage inspections passing at first submission, measured consistently across the project.
Average EQC turnaround
Average time taken for an engineering quality check to be completed and approved.
Average issue closure time
Average time from a non-conformance being raised to being closed with evidence of rectification.
How it was done
Inspections were moved to sequence-aligned checklists completed on site at the point of work, so each record carried the stage, the location, the person and the time.
Once inspections were consistent, a first time right rate became meaningful — the same measure across stages and teams rather than an impression.
Non-conformances raised from failed inspections were assigned with due dates and closed only with photographic evidence, which is what makes an average closure time a real number rather than an estimate.
Related stories
Other organisations that made the same shift.

- PMC
- Real Estate
HCP Project Management · Ahmedabad
How HCP moved quality from paper to live proof across its portfolio
- Quality view across all projects
- Live
- Paper inspection reports since go-live
- 0
- From sign-up to go-live
- 6d

- Contractor
- Infrastructure
Buildstreet · India
How Buildstreet proved quality across every package of a highway project
- Packages set up at the same time
- All
- Paper inspection reports since go-live
- 0
- NCR tracking across the corridor
- Live

- Owner
- Renewable Energy
Hero Future Energies · India
How Hero Future Energies proves field quality on remote solar sites
- Fully offline on a remote site
- Remote
- Inspection data verified at source
- 100%
- Paper records since go-live
- 0
Next step
See digiQC on a project like SJ Contracts Pvt. Ltd.'s.
A 30-minute demonstration configured around your project type and your role.
Live on your first project in 9 days · Unlimited users · Project-based pricing