Hero Future Energies
How Hero Future Energies transformed field quality assurance on a large-scale solar project in a remote area
The client
Hero Future Energies · India
Client profile
- Organisation
- Hero Future Energies
- Role
- Owner
- Project type
- Renewable energy
- Region
- India
At a glance
Inspection data authenticated at source
Paper records maintained since go-live
The challenge
How Hero Future Energies transformed field quality assurance on a large-scale solar project in a remote area
A large-scale solar installation is the same detail repeated at enormous scale, which makes a small systematic error expensive before anyone notices it.
This project was in a remote area, where connectivity cannot be assumed and a quality team cannot physically cover the site each day.
Field quality assurance therefore had to come from the crews doing the installation, recorded where the work happened.
The outcome
What changed
Fully offline deployment on a remote site
The site workflow operated where connectivity could not be relied upon.
Inspection data authenticated at source
Every inspection attributed to the person who carried it out, at the point of work.
Paper records maintained since go-live
Field quality recording moved entirely off paper.
How it was done
Installation checklists were configured to the repeated detail of the site — foundations, mounting structures, modules and electrical work — so crews were asked about the work in front of them.
Records were created in the field and authenticated at source rather than transcribed later, which is what makes them usable as assurance rather than as a report.
Because the hierarchy goes down to individual arrays and strings, a recurring fault could be traced to a block or a crew rather than reported as a site-wide average.
In their words
“digiQC transformed our field quality assurance, ensuring integrity and improving processes. It's a powerful yet simple, cost-effective digital solution.”
Related stories
Other organisations that made the same shift.

- PMC
- Real Estate
HCP Project Management · Ahmedabad
How HCP moved quality from paper to live proof across its portfolio
- Quality view across all projects
- Live
- Paper inspection reports since go-live
- 0
- From sign-up to go-live
- 6d
- Contractor
- Real Estate
SJ Contracts Pvt. Ltd. · India
How SJ Contracts measured its quality for the first time
- First time right at stage level
- 86.4%
- Average EQC turnaround
- 3.3d
- Average issue closure time
- 2d

- Contractor
- Infrastructure
Buildstreet · India
How Buildstreet proved quality across every package of a highway project
- Packages set up at the same time
- All
- Paper inspection reports since go-live
- 0
- NCR tracking across the corridor
- Live
Next step
See digiQC on a project like Hero Future Energies's.
A 30-minute demonstration configured around your project type and your role.
Live on your first project in 9 days · Unlimited users · Project-based pricing