Success Story · Industrial and Infrastructure
Quality approvals in under 2 hours, not the next day.
Sachin Infra Environment was expanding a running effluent treatment plant from 50 MLD to 80 MLD. Every critical check needed head office approval, and paper was holding the work back.
The client
Sachin Infra Environment Limited · Surat
Client profile
- Organisation
- Sachin Infra Environment Limited (SIEL)
- Role
- Owner
- Project
- CETP capacity expansion, 50 MLD to 80 MLD
- Location
- Sachin GIDC, Surat
At a glance
Saved, at least, on every approved checklist stage
Project team time saved, at least
The project
Expanding a plant that could not stop running
SIEL was set up by the dyes and chemical manufacturers of Sachin GIDC. Its common effluent treatment plant serves more than 80 process houses.
The plant had to grow from 50 MLD to 80 MLD. New structures had to be built and connected, and old ones renovated, while the existing plant kept running. Shutdowns could only be planned on days when effluent discharge was very low.
The challenge
Every approval waited for the next day
Checklists were on paper. At the end of the day, the site team scanned them and emailed them to head office for approval.
So approvals usually came the next day. Planned work on site waited, and the project slipped.
A dual approval process was set up to stop defects during execution, because a defect found once the plant is running means downtime and high maintenance cost.
What changed
Approvals from head office, the same hour
Time to a quality approval decision
Approvals that usually came the next day now come in 1 to 2 hours.
Saved, at least, on every approved checklist stage
The project schedule no longer waits for the approval of a checklist stage.
Project team time saved, at least
No more scanning paper checklists and emailing them. Every record is stored and easy to find.
How it was done
The digiQC team understood the process and suggested remote approval. Once an inspection is done on site, it goes to the approver straight away, with photos.
The approver approves it, or sends it back for redo with the exact checklist points to correct. When it is approved, the inspector on site is notified and can start the next activity.
The critical check was the fabrication of the IFAS cage in the aeration tank. If the cage is not made right, the IFAS membrane cannot be installed on it. So every cage needed head office approval before it went in, and now that approval no longer holds up the site.
What the client says
What Sachin Infra Environment says
"Remote approval feature reduces the decision making time to less than 2 hours"
"We implemented digiQC in our quality process and their real time documentation and notification help us to reduce time of approver process drastically"
Related stories
Other companies that made the same shift.

- PMC
- Real Estate
HCP Project Management · Ahmedabad
How HCP moved quality from paper to live proof across its portfolio
- Quality view across all projects
- Live
- Paper inspection reports since go-live
- 0
- From sign-up to go-live
- 6d
- Contractor
- Real Estate
SJ Contracts Pvt. Ltd. · India
How SJ Contracts measured its quality for the first time
- First time right at stage level
- 86.4%
- Average EQC turnaround
- 3.3d
- Average issue closure time
- 2d

- Contractor
- Infrastructure
Buildstreet · India
How Buildstreet proved quality across every package of a highway project
- Packages set up at the same time
- All
- Paper inspection reports since go-live
- 0
- NCR tracking across the corridor
- Live
Next step
See digiQC on a project like Sachin Infra Environment's.