Success Story · Industrial and Infrastructure

Quality approvals in under 2 hours, not the next day.

Sachin Infra Environment was expanding a running effluent treatment plant from 50 MLD to 80 MLD. Every critical check needed head office approval, and paper was holding the work back.

The client

Sachin Infra Environment Limited · Surat

Client profile

Organisation
Sachin Infra Environment Limited (SIEL)
Role
Owner
Project
CETP capacity expansion, 50 MLD to 80 MLD
Location
Sachin GIDC, Surat

At a glance

< 2 hrs

Time to a quality approval decision

12 hrs

Saved, at least, on every approved checklist stage

10%

Project team time saved, at least

The project

Expanding a plant that could not stop running

SIEL was set up by the dyes and chemical manufacturers of Sachin GIDC. Its common effluent treatment plant serves more than 80 process houses.

The plant had to grow from 50 MLD to 80 MLD. New structures had to be built and connected, and old ones renovated, while the existing plant kept running. Shutdowns could only be planned on days when effluent discharge was very low.

The challenge

Every approval waited for the next day

Checklists were on paper. At the end of the day, the site team scanned them and emailed them to head office for approval.

So approvals usually came the next day. Planned work on site waited, and the project slipped.

A dual approval process was set up to stop defects during execution, because a defect found once the plant is running means downtime and high maintenance cost.

What changed

Approvals from head office, the same hour

< 2 hrs

Time to a quality approval decision

Approvals that usually came the next day now come in 1 to 2 hours.

12 hrs

Saved, at least, on every approved checklist stage

The project schedule no longer waits for the approval of a checklist stage.

10%

Project team time saved, at least

No more scanning paper checklists and emailing them. Every record is stored and easy to find.

How it was done

The digiQC team understood the process and suggested remote approval. Once an inspection is done on site, it goes to the approver straight away, with photos.

The approver approves it, or sends it back for redo with the exact checklist points to correct. When it is approved, the inspector on site is notified and can start the next activity.

The critical check was the fabrication of the IFAS cage in the aeration tank. If the cage is not made right, the IFAS membrane cannot be installed on it. So every cage needed head office approval before it went in, and now that approval no longer holds up the site.

What the client says

What Sachin Infra Environment says

"Remote approval feature reduces the decision making time to less than 2 hours"
"We implemented digiQC in our quality process and their real time documentation and notification help us to reduce time of approver process drastically"

Related stories

Other companies that made the same shift.

  • PMC
  • Real Estate

HCP Project Management · Ahmedabad

How HCP moved quality from paper to live proof across its portfolio

Quality view across all projects
Live
Paper inspection reports since go-live
0
From sign-up to go-live
6d
Read the full story
  • Contractor
  • Real Estate

SJ Contracts Pvt. Ltd. · India

How SJ Contracts measured its quality for the first time

First time right at stage level
86.4%
Average EQC turnaround
3.3d
Average issue closure time
2d
Read the full story
  • Contractor
  • Infrastructure

Buildstreet · India

How Buildstreet proved quality across every package of a highway project

Packages set up at the same time
All
Paper inspection reports since go-live
0
NCR tracking across the corridor
Live
Read the full story

Next step

See digiQC on a project like Sachin Infra Environment's.

A short walkthrough of digiQC set up for your project type and your role.

Request a DemoMore success stories

digiQC. Your quality partner.