Success Story · Real Estate
No more checklist books. No more skipped checkpoints.
Sangini Group has completed 65 projects in Surat since 1984. On Sangini Nirvana, a 3 BHK project of two towers, it moved site QC from paper books to the phone.
The client
Sangini Group · Surat
Client profile
- Organisation
- Sangini Group
- Role
- Owner / Developer, since 1984
- Project
- Sangini Nirvana: two towers of 3 BHK homes
- Location
- VIP Road, Surat
At a glance
Stage-wise checks, in sequence
Senior engineers review reports online
The challenge
Lost checklist books and skipped checkpoints
Sangini Group builds homes and commercial projects, with 65 projects and about 85 lakh sq ft completed since 1984.
Checklist books went missing and had to be searched for. Engineers carried several hard copies to every inspection, and sometimes forgot one.
Senior engineers spent a lot of time cross-checking the work of junior engineers. And because inspections were manual, checkpoints were sometimes skipped.
What changed
Checklists on the phone, checks in order
Every checklist on the mobile app
Nothing to carry and nothing to forget.
Stage-wise checks, in sequence
The sequence makes sure no checkpoint is skipped, which cuts human error.
Senior engineers review reports online
They follow and check reports with much less effort.
How it was done
Reports are stored securely and can be pulled up whenever they are needed.
The biggest changes: less time preparing QC reports, more work done, and time saved for senior engineers.
What the client says
What Sangini Group says
"With digiQC managing multiple sites has become much easier for us, compared to the traditional system which was very time-consuming."
"digiQC helped us in streamlining quality control, data management & report generation, while eliminating paperwork"
Related stories
Other companies that made the same shift.

- PMC
- Real Estate
HCP Project Management · Ahmedabad
How HCP moved quality from paper to live proof across its portfolio
- Quality view across all projects
- Live
- Paper inspection reports since go-live
- 0
- From sign-up to go-live
- 6d
- Contractor
- Real Estate
SJ Contracts Pvt. Ltd. · India
How SJ Contracts measured its quality for the first time
- First time right at stage level
- 86.4%
- Average EQC turnaround
- 3.3d
- Average issue closure time
- 2d

- Contractor
- Infrastructure
Buildstreet · India
How Buildstreet proved quality across every package of a highway project
- Packages set up at the same time
- All
- Paper inspection reports since go-live
- 0
- NCR tracking across the corridor
- Live
Next step
See digiQC on a project like Sangini Group's.
A short walkthrough of digiQC set up for your project type and your role.
digiQC. Your quality partner.